House outline blue

Professional Physical Capital Needs Assessment (PCNA) & Energy Audit Services for the Manchester Redevelopment

Professional Physical Capital Needs Assessment (PCNA) & Energy Audit Services for the Manchester Redevelopment

RFP/RFQ#2020-30

CLOSED, To Be Rebid

The Allies & Ross Management and Development Corporation (“ARMDC”), an instrumentality of the Housing Authority of the City of Pittsburgh (“HACP”), hereby requests proposals from qualified professionals to conduct a Physical Capital Needs Assessment (“PCNA”) and Energy Audit (“EA” and together with PCNA, the “Services”) for eighty-six (86) scattered site Low-Income Public Housing (“LIPH”) units located in the Manchester neighborhood of the City of Pittsburgh, as a part of the Manchester Redevelopment (PA-01-72) (see Attachment L – Schedule of Properties and Site Map). A more detailed scope of services is provided in Section II of this Request for Proposals (“RFP”).

The United States Department of Housing and Urban Development (“HUD”) is anticipated to provide the funding for this work through the Capital Fund Program and all work performed must be in compliance with all rules and regulations of this program and all other applicable Federal regulations including but not limited to, Handicap Accessibility (Section 504), Americans with Disabilities Act (“ADA”), Uniform Federal Accessibility Standards (“UFAS”), Davis-Bacon wage requirements, Environmental Protection Agency rules and regulations, HUD’s Modernization Design Standards and Federal procurement requirements. In addition to the Federal laws and regulations, all work must also be performed in compliance with all Commonwealth of Pennsylvania laws and regulations, and local building codes.


Issue Date:

Dec 30, 2019 09:09 am

Meeting Date:

Jan 9, 2020 11:00 am

Deadline Date:

Jan 23, 2020 11:00 am

Procurement Details:

 

ARMDC is contemplating the award of a Professional Services Contract, or contracts, for an initial Term of one (1) year, with two (2), one (1) year extension option for a total of three (3) years, in the form of the Contract (Attachment A) through this solicitation process. If submitting alterations to the ARMDC contract for review and acceptance by ARMDC, please submit an electronic version in MS Word format on a CD or USB flash drive. If submitting your company contract for review and acceptance by ARMDC, please submit an electronic version in MS Word format on CD or USB flash drive. If your contract is not included with your proposal it is assumed that ARMDC’s contract will be used and is binding


Contact Information:

Mr. Kim Detrick
(412) 456-5116 Opt #1
Kim.Detrick@hacp.org
HACP Procurement Department
100 Ross Street
2nd Floor Suite 200
Pittsburgh, PA 15219


Question Deadline:

Jan 16, 2020 11:00 am

Bid Instructions:

HACP Procurement Department
100 Ross Street
2nd Floor Suite 200
Pittsburgh, PA 15219


Categories:

Accessibility/UFAS/504 Consulting, Appraisals, Architects and Engineers, Civil Engineering, Construction Management, Consultants, Demolition Services, Developers, Development Services, Environmental Engineering/Consulting, General, General A&E Services, Geo-Technical Engineering, HazMat Abatement, Inspections, Insurance, Professional Services, Property Management, Property Management, Quality Control/Testing Services, Safety, Security and Safety, Site Services, Site Services, Structural Engineering, Technical

Procurement Documents

Dec 30, 2019

Jan 7, 2020

Jan 10, 2020

Download Bag

Please login as a vendor to download.